Executive house
- Stage 1:
Existing house to decayed to renovate, demolished and sire cleared. - Stage 2:
Concrete slab poured and back of site stabilized with retaining walls. - Stage 3:
Roof framed up and ready for cladding. - Stage 4:
Roof on, wrap on and windows installed. - Stage 5:
Cladding on and deck hand rails installed. - Stage 6:
Front door entrance over curved bridge driveway.