Leaky Building
- Stage 1:
Cladding removed, Rab board installed prior to cavity system. - Stage 2:
Aluminum cladding installed and hand rails up. - Stage 3:
View from entrance across deck out to sea. - Stage 4:
Ultra durable design at front to deal with high risk enviroment. - Stage 5:
Traditional design at street frontage. - Stage 6:
Engineered tiles on support jacks to create level entry from living area.